Descarga de Bultos de Sobremedida
LOGISTICAL SUPPORT OF ASIMAR
30 YEARS OF TRAJECTORY



Since 1984 Asimar S.A. has been a key player in the development of maritime-port activities in the Quintero Bay, providing logistical support to the main energy companies in the country, the community and the Chilean Navy
In its more than 30 years of experience, the unloading of Oversized Packages has been carried out efficiently, demonstrating that the good administration and operation of the port area has made it possible to optimize the available resources, with very diverse, safe and efficient activities.
ADVANTAGES FOR UNLOADING OVER SIZE PACKAGES
ASIMAR DOCK
- The unloading of oversized packages through the Asimar dock, generates a significant reduction in the total transfer time, due to its proximity to the companies in the area, both with respect to the Port of Valparaíso and San Antonio;
- The land transfer from Quintero (Asimar Dock) produces a lower environmental impact in land transportation, city and interurban routes, than in ports and cities, which must face an operation like the one described;
- Considering the above, there is less risk of accidents and possible damage to oneself or to third parties, therefore savings in indirect expenses should also be generated in this way, through insurance premiums;
- The direct expenses for clearing routes and civil works to reinforce bridges or remove objects are significantly lower than those generated in other ports, due to the shorter distance to be covered and mainly due to the fewer existing obstacles for the transfer of this product. type of load;
- The exclusive layout of the surface of the dock and embankment, which Asimar offers its client, for the necessary pre- and post-unloading operations, when a ship with oversized packages arrives, allows for greater safety and ease of operation;
- The permanent interaction with the community of Quintero and its authorities by Asimar S.A., allows an agile and efficient communication with all of them, facilitating the processing of the corresponding permits and solutions to any difficulties that may arise for these operations.
PREVIOUS EXPERIENCES
Route: Muelle Asimar, Quintero - Con con
The experience of Asimar S.A. The year 1989 begins, with the shipment of the Belfi crane that is used to drive the piles of the Ventanas Wharf.
The maximum weight mobilized was a package of 220 tons, but it is not the maximum possible to unload, if the ship adjusts drafts and meets max. length.